Free Change Order Form

One page. Four itemized change lines, each with its own price. Both signatures on the same sheet as the scope and the money.

The form for the moment a customer asks for something that was not on the quote. Fill it in, get it signed, then do the work. It takes about two minutes and it is the difference between billing for the extra and arguing about it three weeks later.

Fillable PDF, the one you hand to the customer and get signed. Works on a phone, a tablet or a laptop.

Download PDF

PDF · 38 fillable fields · ~31 KB

Excel version, adds up the change lines and the new contract total for you. Easier to edit and to keep as a record.

Download Excel

Excel (.xlsx) · Compatible with Excel, Google Sheets, Numbers and LibreOffice · ~7 KB

Add your company name, contact line and registration number in the header before you use it. Free to hand to your crew or anyone else who needs one.

What is on it

Change order number and the original contract it attaches to, so the two documents are tied together. The date the change was agreed, which is not the same as the date of the original contract. Four itemized change lines, each with its own description and its own price change. A total, plus the original contract figure and the new contract total, so the customer sees where the work now stands instead of just the delta.

Then a reason for the change, which is the part that wins the argument later: customer request, unforeseen condition, code requirement or design change, with a box for photos attached. Schedule impact, because extra work costs days as often as it costs dollars. And signature, printed name and date blocks for both parties, on the same sheet as the scope and the price.

Why itemized lines instead of one box

Most free change order templates have a single description box and a single total. That is the one thing they get wrong.

Several states require the price change for each deviation from the plans or specifications, not one figure for the whole change order. Pennsylvania's Home Improvement Consumer Protection Act is written that way, and it makes deviating without a compliant written change order a prohibited act. If you are curious how far that goes, the breakdown is in change order requirements for Pennsylvania contractors.

This form is built to that stricter standard on purpose. A form that satisfies the toughest version of the rule satisfies the loose ones automatically, so it works whatever state you are in. If you are outside Pennsylvania, it is worth ten minutes to look up your own state's home improvement statute, because most of them have one.

Using it without annoying the customer

The paperwork is the easy half. The hard half is the ten seconds after somebody asks for something extra, and most of us have nothing ready to say. There is a word for word version of that conversation, plus how to handle the three situations scope creep actually shows up in, in change orders and how to charge for scope creep.

Short version: it is not extra work, it is additional work. It was not on the quote and it was not priced. Quote it, get it signed, then do it.

What is not in here

This is one form out of seventeen. The change order is the one people need most often, so it is the one that is free. The other sixteen are in the Contractor Forms Bundle, and they are listed by name below so you can see exactly what you would be getting rather than guessing.

  • Invoice, auto-calculating line items, tax and totals
  • Estimate / Quote, scope, exclusions and an expiry date
  • Service Agreement, the contract you sign before the work starts
  • Work Order, what the crew takes to site
  • Lien Waiver, conditional and unconditional
  • Receipt, proof of payment for deposits and progress draws
  • Payment Tracker, what is owed, what cleared, what is late
  • Daily Job Log, hours, weather, who was on site
  • Punch List, the closeout items, with sign off
  • Material Log, what you bought against what you billed
  • Job Completion, the customer signs that the work is done
  • Warranty Certificate, what you cover and for how long
  • Feedback Request, the review ask, after you have left
  • Communication Log, the record of what was said and when
  • Subcontractor Agreement, terms for anyone you bring on
  • Letterhead, matching header for anything else you send

All seventeen carry the same branded header with fill-in placeholders for your company name, logo, address, phone, email, licence number and website, so they look like one set rather than seventeen downloads from seventeen places.

See the full bundle, $29.99 →

Common questions

Is the change order form actually free?

Yes. The PDF and the Excel version both download directly with no email signup and no account. Add your own company name and contact line at the top and it is ready to use.

Why does it have separate lines instead of one description box?

Because some states require the price change for each deviation, not one total for the whole change order. A single box and a single number does not show that. Four itemized lines satisfies the strictest version of the rule, which means it holds up anywhere.

Can I fill it in on my phone?

Yes. The PDF has real form fields, so it fills in on a phone, a tablet or a laptop in any normal PDF reader. You do not have to print it.

What is the difference between the PDF and the Excel version?

The PDF is the one you hand to a customer and get signed. The Excel version adds up the change lines and the new contract total for you, and is easier to edit if you want to change the wording or keep a record.

Does this work for commercial work too?

The form does. The legal requirements behind it are residential. Home improvement statutes govern work on a private residence, while commercial change orders are governed by whatever your own contract says about notice and timing.