What the hours cover

Photograph the wiring, transfer it terminal by terminal, set the switches to match, and run a full heat cycle.

The math at the book numbers

(billable hours × loaded labor rate × labor factor) + (material cost × markup), rounded to the nearest $10

The labor factor is the overhead multiplier divided by one minus the target margin. At 1.4 and 22 percent that is 1.79.

Furnace control board. 1.5 hours × $135 × 1.79 is $363.46 of labor. $245 of material × 1.35 is $330.75. Together that is $694.21, rounded to $690.

Better is the Good price times 1.25 and Best is times 1.55. Same job done better, not a different job.

Same job at three labor rates

Tier$110 rate$135 rate$165 rate
Good$630$690$770
Better$780$870$970
Best$970$1,080$1,200

All three tiers at each rate. Everything else left at the book numbers.

What moves this number

  • What killed the old board. A shorted component downstream will take out the new one.
  • OEM only boards and communicating systems. The part can be double or triple the allowance.
  • A board that is fine. Confirm it before you order it.

Not in this price

The diagnostic, and the shorted part that took the board out if there is one.

The full breakdown is in the guide: How to Price an HVAC Service Call.