What the hours cover

Recovery and removal, pad prep and set, the coil into the plenum, line set, electrical and controls, evacuation to 500 microns, charge and commissioning, cleanup and haul-off.

The math at the book numbers

(billable hours × loaded labor rate × labor factor) + (material cost × markup), rounded to the nearest $10

The labor factor is the overhead multiplier divided by one minus the target margin. At 1.4 and 22 percent that is 1.79.

Condenser + coil, 3 ton. 8 hours × $135 × 1.79 is $1,938.46 of labor. $2,385 of material × 1.35 is $3,219.75. Together that is $5,158.21, rounded to $5,160.

Better is the Good price times 1.25 and Best is times 1.55. Same job done better, not a different job.

Same job at three labor rates

Job$110 rate$135 rate$165 rate
Condenser + coil, 3 ton$4,800$5,160$5,590
Condenser + coil, 2 ton$4,260$4,620$5,050
Condenser + coil, 4 ton$6,000$6,450$6,990
Condenser + coil, 5 ton$6,680$7,130$7,670
Condenser only, 2 ton$2,720$2,950$3,220
Condenser only, 3 ton$3,130$3,350$3,620
Condenser only, 4 ton$3,860$4,130$4,460
Condenser only, 5 ton$4,400$4,670$5,000

Good tier at each rate. Everything else left at the book numbers.

What moves this number

  • Refrigerant match. Replacing only the condenser on an R-410A system is a mismatch with new equipment. The coil usually goes too, so say it before you quote.
  • An evacuation that will not hold. That turns an eight hour job into a return trip.
  • Equipment quoted at last quarter's cost. On this job a stale price is off by hundreds.
  • Duct changes, a new line set, a condensate pump, electrical upgrades. Real work that gets swallowed to keep the quote clean.

Not in this price

Duct modifications, a new line set, electrical upgrades, the permit fee, and anything else that is not swapping the equipment. Each of those is its own line.

The full breakdown is in the guide: How to Price a Full HVAC System Replacement.