What the hours cover

Lock out, move the wires across, verify pull in voltage at the coil, and check the contacts on the way out.

The math at the book numbers

(billable hours × loaded labor rate × labor factor) + (material cost × markup), rounded to the nearest $10

The labor factor is the overhead multiplier divided by one minus the target margin. At 1.4 and 22 percent that is 1.79.

Contactor. 0.75 hours × $135 × 1.79 is $181.73 of labor. $22 of material × 1.35 is $29.70. Together that is $211.43, rounded to $210.

Better is the Good price times 1.25 and Best is times 1.55. Same job done better, not a different job.

Same job at three labor rates

Tier$110 rate$135 rate$165 rate
Good$180$210$250
Better$220$260$310
Best$280$330$390

All three tiers at each rate. Everything else left at the book numbers.

What moves this number

  • Why it failed. A shorted low voltage wire will take out the next one too.
  • Pitted contacts that have been cooking the compressor terminals.
  • Pole count and coil voltage. Carry the common ones or it is a second trip.

Not in this price

The dispatch and diagnostic fee, and repairing a low voltage short if that is what killed it.