What the hours cover

Get to the burner compartment, swap the ignitor without touching the element, and watch a full ignition sequence.

The math at the book numbers

(billable hours × loaded labor rate × labor factor) + (material cost × markup), rounded to the nearest $10

The labor factor is the overhead multiplier divided by one minus the target margin. At 1.4 and 22 percent that is 1.79.

Furnace ignitor, hot surface. 0.75 hours × $135 × 1.79 is $181.73 of labor. $35 of material × 1.35 is $47.25. Together that is $228.98, rounded to $230.

Better is the Good price times 1.25 and Best is times 1.55. Same job done better, not a different job.

Same job at three labor rates

Tier$110 rate$135 rate$165 rate
Good$200$230$270
Better$240$290$340
Best$300$350$420

All three tiers at each rate. Everything else left at the book numbers.

What moves this number

  • Furnace specific ignitors that are not on the truck.
  • Short cycling or a dirty filter that will crack the new one the same way.
  • Attic and crawlspace furnaces. Access is time.

Not in this price

The diagnostic, and fixing whatever is making the furnace short cycle.

The full breakdown is in the guide: How to Price an HVAC Service Call.