Search for HVAC flat rate pricing and you mostly get two things. Software companies that want a demo call before they will show you a single number, and homeowner sites quoting national averages that know nothing about your truck, your insurance or your town.

So here is an actual price list. Twenty-three jobs you run all year, with the hours and the material on every line and the Good, Better and Best price that comes out the other end. Every number is built on the same formula the flat rate calculators on this site use, set up for a Philadelphia metro shop at a $135 loaded labor rate.

Use it as a worked example, not a survey of what everybody charges. If your rate is $110 or $165 the numbers move, and further down I show you how much.

How every price on this list is built

Price = (billable hours × loaded labor rate × labor factor) + (material cost × 1.35), rounded to the nearest $10.

  • Loaded labor rate, $135. Wage plus payroll tax, comp, insurance, and the hours you spend driving and quoting that nobody pays for. It is not what the tech takes home. If you do not know yours, the labor rate calculator works it out.
  • Labor factor, 1.79. A 1.4 overhead multiplier divided by one minus a 22 percent target margin. This is the piece most shops leave out, and it is why the prices feel fine and the bank account does not.
  • Material markup, 35 percent on what you pay at the supply house.
  • Minimum charge, $175. Any repair that prices under that bills at $175, because the truck still rolled.
  • Better is Good times 1.25, Best is Good times 1.55. Same job done better, not a different job.

HVAC repair price list

These are the calls that fill a July. The hours are real time on site, start to clean-up. None of them include the diagnostic, which is its own line and is covered further down. Click any job to open its calculator and put your own rate in.

RepairGoodBetterBest
Run capacitor
0.5 hrs, $15 material
$175$180$220
Flame sensor
0.5 hrs, $18 material
$175$180$230
Contactor
0.75 hrs, $22 material
$210$260$330
Hot surface ignitor
0.75 hrs, $35 material
$230$290$350
Condenser fan motor
1.5 hrs, $145 material
$560$700$870
Inducer motor
1.5 hrs, $225 material
$670$830$1,030
Furnace control board
1.5 hrs, $245 material
$690$870$1,080
TXV (expansion valve)
2.5 hrs, $125 material
$770$970$1,200

Two of these, the run capacitor and the flame sensor, come in under the minimum, so the Good price is $175 at almost any rate. Without the minimum, half an hour and a $15 capacitor works out to about $140, which is less than it costs you to send the truck. That is what the minimum is for. The capacitor pricing guide makes the whole argument.

The tune-up

An hour and a half and $15 of material: coil wash, superheat and subcooling, amp draws, a capacitor check and a drain flush, all written down with the readings. At the book numbers that is $380 Good, $480 Better and $590 Best.

That is a lot more than the $89 tune-up on the door hanger down the street, and it should be. The cheap tune-up is a loss leader built to find repairs. If you want to run one, run it on purpose, and know that every one you sell at $89 costs you money before you find anything. The tune-up calculator shows the gap at your own rate.

HVAC replacement price list

Changeouts by size and fuel. The material figure is your cost for the equipment plus the small stuff, before markup.

ReplacementGoodBetterBest
Condenser only, 2 ton
5 hrs, $1,285 material
$2,950$3,680$4,570
Condenser only, 3 ton
5 hrs, $1,585 material
$3,350$4,190$5,190
Condenser only, 4 ton
6 hrs, $1,985 material
$4,130$5,170$6,410
Condenser only, 5 ton
6 hrs, $2,385 material
$4,670$5,840$7,240
Condenser and coil, 2 ton
8 hrs, $1,985 material
$4,620$5,770$7,160
Condenser and coil, 3 ton
8 hrs, $2,385 material
$5,160$6,450$8,000
Condenser and coil, 4 ton
10 hrs, $2,985 material
$6,450$8,070$10,000
Condenser and coil, 5 ton
10 hrs, $3,485 material
$7,130$8,910$11,050
Gas furnace, 80% AFUE
6 hrs, $985 material
$2,780$3,480$4,310
Gas furnace, 96% AFUE
6 hrs, $1,485 material
$3,460$4,320$5,360
Electric furnace
5 hrs, $785 material
$2,270$2,840$3,520
Oil furnace
8 hrs, $1,685 material
$4,210$5,270$6,530
Heat pump, 3 ton
8 hrs, $2,685 material
$5,560$6,950$8,620
Heat pump, 5 ton
10 hrs, $3,685 material
$7,400$9,250$11,470

Look at where the money sits on those lines. On the 3-ton condenser and coil, $3,220 of the $5,160 Good price is equipment and material with the markup on it. The labor is under $2,000. That is why a changeout feels like the big ticket and earns less per hour than a good week of repairs. The system replacement guide walks that math phase by phase.

What is not in these prices

  • The diagnostic and dispatch. Finding out it was the capacitor is its own line. The HVAC book carries it at $99. If you are not sure what yours should be, the trip charge calculator will tell you. The service call guide covers how the two lines work together.
  • After hours. Time and a half on the work, decided once in daylight, not at eleven at night with the customer standing in the driveway.
  • Refrigerant beyond what you recovered, and a filter drier any time the system is opened. Price them on their own lines.
  • Whatever the failed part took with it. A capacitor that died because the motor is going. A board a shorted part burned up. Check before you pack up.
  • On changeouts: duct modifications, a new line set, electrical upgrades, venting changes and chimney liners, gas line work, the thermostat on a heat pump, and the permit fee. Each one is its own line, and on an older house they add up.

What happens at your rate

Here is the Good price for six of these jobs at three loaded rates, with everything else left alone.

Job, Good tier$110 rate$135 rate$165 rate
Run capacitor$175$175$175
Contactor$180$210$250
Condenser fan motor$490$560$640
Furnace control board$630$690$770
Condenser and coil, 3 ton$4,800$5,160$5,590
Gas furnace, 80% AFUE$2,510$2,780$3,110

The repairs move with your rate. The changeouts hardly do, because most of their price is equipment. Worth knowing before you raise your rate: the increase lands mostly on service work, and that is where a customer has the least to compare you against. Changeouts get three quotes. A fan motor at nine at night gets yours.

From a list to a book

Twenty-three lines will get you through a lot of July. They will not get you through the call that turns out to be a hard start kit, a blower motor, a condensate pump, a zone damper or a defrost board. A working book is closer to two hundred lines, all built on the same formula so they agree with each other, and all tied to one rate cell so they move together when your costs do.

You can build that yourself, and this guide shows you how. Or you can start from one that is already built.

Whichever way you go, the rule is the same. One formula, one rate, every line. The day a customer asks why the fan motor is $560, you can show him the hours and the part, and he can see it is not a number you made up in his driveway.

Frequently Asked Questions

What should an HVAC company charge for common repairs?
At a $135 loaded rate with overhead and margin built in, the common repairs land between $175 and about $770 for the Good tier: $175 for a run capacitor, $210 for a contactor, $560 for a condenser fan motor and $770 for a TXV. The diagnostic is a separate line on top. Your own rate decides where you land.
Why does a $15 capacitor cost $175 to replace?
Because the price pays for the visit, not the part. At a $135 rate the formula gives about $140 for half an hour and the part, which is less than it costs to send the truck. A $175 minimum charge is what makes small repairs worth running.
How much should an AC tune-up cost?
At the book numbers, an hour and a half and $15 of material prices at $380 for the Good tier. Shops that advertise $89 tune-ups are selling a loss leader to find repairs. That can work, but do it on purpose and know what each one costs you.
Do HVAC replacement prices include ductwork and permits?
Not on this list. Duct modifications, a new line set, electrical upgrades, venting changes and the permit fee are each their own line. Quote them separately so the customer can see what changed and why.